The company has obtained the Certificate of compliance of System of a quality management (ISO 9001:2000)
Complete work on the normalization of the thermal displacement turbine unit.
The complex includes:
Survey turbine unit of the Program, approved by the Chief Engineer of the plant.
Development of the normalization of the thermal displacement.
Development of technical documentation.
Development of technology for the installation of the IFF (metal-fluoroplastic tape) on the base frame, front and middle shells bearings.
Delivery of 72-s meters IFF.
Installing antifriction material foundation for the frame housings front and middle of bearings.
Delivery 4-6 power load-cell type DC-25 DC-60 DC-80 (depending on the type of turbine), which are needed to determine the reactions of the pillars of blades cylinders, as in the repair, and in the process of working under pressure.
Technical guidance on the normalization of the thermal displacement, which will be assigned qualified professionals.
A detailed techno-commercial offer, you can receive, by sending an e-mail mail@lenturbo.ru or fax (812) 531-20-20


