The company has obtained the Certificate of compliance of System of a quality management (ISO 9001:2000)
Electrical Engineering Department
The introduction of microprocessor control systems and anti-wreck automation requires specialized engineering solutions to power auxiliary systems in the set of operational DC uninterruptible power supply devices, ACSTP and digital communications, EMC and systems to protect against harmful electromagnetic influences. Violation of the requirements of reliability, quality, automation and reliable monitoring of their nutritional needs - operational DC and battery may lead to accidents and fires.
The company develops, manufactures and implements «turnkey» complete system for working with microprocessor devices of protection and management:
- Complete new generation of OPT to the microprocessor systems
- United powering installations of communication and ACSTP
- Systems of protection of microprocessor complexes and digital communication from dangerous electromagnetic influences
-protection of own needs with microprocessor monitoring
- Complex installations of the frequency-regulated electric drive and smooth start-up for controlling the asynchronous engines.
Complete the operating system, the DC production of Ltd. «ETF« Lenturboremont »take into account the special requirements of microprocessor systems «Chains of relay protection and automatics» applied to objects of power, the quality of the voltage, the degree of automation and electromagnetic compatibility.
We are working at facilities of RAO UES OF RUSSIA, the industrial enterprises, special facilities. We offer various options for implementation, including seismic performance for the plant, a complete solution to EMC problems and impulse protection.
Unlike many factories - manufacturers and middlemen involved in only its delivery, we believe in a holistic approach and assume a full range of activities and services associated with the reconstruction of the facility, including:
- The optimal technical and commercial solutions for the reconstruction;
- Providing the necessary technical documentation, including source data for General planner for the reconstruction of the entire facility, work with the plasmatic glucose;
- Implementation of the full range of design works to the harmonization of the approval;
- Equipment on the Customer's specifications or the Project;
- A dismantling - the installation of the equipment as their own, and with the subcontracting specialized organizations;
- General management of the activities, and pre-repairing, after-repairing tests, tuning and adjustment systems;
- A concomitant of modernization, the supply of components and accessories;
- Object delivery;
- Customer’s staff training;
- Service and technical support for warranty and follow-up periods;
-An integrated approach - works on a turnkey basis
The availability of licenses for construction permits in conjunction with the delivery of equipment repair or reconstruction of facilities, systems, ventilation, heating and other arrangements agreed with the Employer jobs.
New technologies are implemented on the following sites of energy and industry:
• Vyborgskaya transformation substation MEN Northwest
• PS 750 KV Leningrad MEN Northwest
• Kola NPP
• Lenenergo (on 8 electric plants 330 KB)
• Yantarenergo (on 8 electric piants 110 KB)
• Substation 330 KV Central Yantarenergo
• Substation 330 KV Jaroslavl MEN Northwest
• Substation 220 KV MEA Bryanskaya Northwest
• Novaya ERA
• Lukoil-Kaliningradmorneft
• SeverStal
• Vodokanal-SPB


