The company has obtained the Certificate of compliance of System of a quality management (ISO 9001:2000)
Reconstruction schemes drainage pipes pass of high-pressure cylinder and the intermediate-pressure cylinder
A proposed scheme allows drainage warmed up as the top-down or bottom-up areas of the by-pass pipes, improve the conditions up steam boxes RK, which reduces the chance of moisture in the cylinder and reduces the time warm-up bypass pipe and a common start time, about 10 minutes.
The reconstruction does not require opening the cylinder and the turbine can be made in maintenance.
The complex includes:
- Supply of connecting pipe.
- Technical guidance on the installation of connecting pipe sections upstream turbine bypass control valves or boxes.
A detailed techno-commercial offer, you can receive, by sending an e-mail mail@lenturbo.ru or fax (812) 531-20-20


