The company has obtained the Certificate of compliance of System of a quality management (ISO 9001:2000)
Steam turbines
Ltd. "ETF" Lenturboremont "prepared to consider the technical tasks with the issue of customer opinions about the possibility and practicability of the project to its feasibility study, prepare a techno-commercial offer and / or conduct a technical examination of the finished project.
If necessary, our specialists will carry out a full cycle of works related to the implementation of the job tasks, from conducting the necessary engineering calculations for the optimization of technical solutions and develop a coherent program of study with the Customer turbine unit or a unit to design delivery of technical and financial documentation in the start-up unit into operation after the project. In doing so, we are implementing a solution and agreement with customer technical issues arising during the test, repair, and during operation, a technical manual disassembly sites, survey, restoration of their efficiency, assembly, testing turbine unit to its output in the repair and after repair or modernization, supervision, and technical support of the warranty period. In the process, our specialists are ready to perform design work and calculations, with the development and harmonization of any stage of the project, to produce design documentation, prepare a list of units and spare parts needed in the process of project implementation, manufacture and supply units and spare parts to ensure the planned input turbine unit (block) in operation, to prepare a list of parts for the following repairs, extend the life of major sites, to develop guidelines for the use of new technologies implemented in the project, training of operating staff.
The availability of a license for carrying out the functions of general contractor allows implementing complex technical projects «turnkey» with specialized contractors. Experience in operational and technical management professionals Ltd. «ETF« Lenturboremont »relieve the customer from the need to coordinate the actions of contractors.
We are ready for any forms of cooperation.
Projects Ltd. «ETF« Lenturboremont »by steam theme:
Upgrading Automatic regulation systems for turbines K-200 - K-800,
Modernization steam distribution of turbines R-50 - K-800
Complex modernization of turbines PT-60 PT-80, TO-200
Modernization of the steam turbine T-180/210-130.
SSP for steam turbine power 50-800 MW.
Installation of honeycomb seal