The company has obtained the Certificate of compliance of System of a quality management (ISO 9001:2000)
For the turbine K-300-240
This allows upgrading:
• increase the reliability of the service-switching point (SSP)of the intermediate-pressure cylinder,
• reduce the likelihood of warping its hubs, resulting in steam, as well as cup of air in the vacuum system;
• improve maintainability;
• be able to access the balancing slot on dummise SSP without opening the cylinder;
Compensatory ring is not installed.
To ensure uniformity of fill chamber sealing steam supply and steam removal performed in the upper and lower half of the fireplace chamber.
In addition, the reconstruction scheme seal with cooling SSP IPC steam from the rear end seal HPC.
The complex includes:
- Development project for the modernization of the front end seal, further processing of the lower half of the front of the intermediate pressure cylinder schemes suction pipes and steam on the front seal IPC.
- Producing a new fireplace front of the camera magazines, magazines number 3, sector for the lower half of the cylinder.
- Further processing magazines number 2.
- Technical guidance on the implementation of projects.
- Secondment of experts for setting up the system, testing and refinement.
A detailed techno-commercial offer, you can receive, by sending an e-mail mail@lenturbo.ru or fax (812) 531-20-20


